 |
Specialist
Belgian building team plus local carriers |
 |
Containers
to be delivered within 5m of the building site |
 |
Sitting
on variable height wooden blocks, standing in its own weight |
 |
Not
anchored to the ground and can stand on soft or hard surfaces |
 |
Site
must have a gradient no greater than 30cm in 1 metre |
 |
During
the build it is necessary to have four temporary anchor points (ie.
stakes in the ground or, in the event of a hard surface, heavy blocks
or motor vehicles) |
 |
Building
time: Approximately 12 hours |